Serving Southern Oregon
Mon–Sun · 7:00 AM–6:00 PM
Removal of existing pavement markings for approved property projects and layout changes.
Renfro provides line removal as an approved service category. Begin with the current markings, planned layout, and the paved surface involved.
Removal methods and final scope are confirmed for the project. Line removal can be discussed before updated striping when existing markings would conflict with the new plan.

For properties where existing lines, arrows, symbols, or other markings no longer match the planned layout.
For owners preparing to discuss removal before new striping is scheduled.
For projects where the surface, current markings, and desired result need property-specific review.
The markings being considered for removal are identified with photos and a plan when available.
New striping can be discussed separately when it is part of the property plan.
Removal method and expected finished appearance are not promised until the surface and markings are reviewed.
The exact included work is confirmed from the property and requested result. These details help define the service-specific scope:
The surface, marking type and extent, existing condition, intended new layout, and access help determine the approved removal scope.
Methods and expected appearance are confirmed for the project; the website does not promise one method or a completely invisible prior layout.

Show the overall paved area and closer views of markings being considered for removal.
Provide a drawing or explanation of the layout that should remain or replace it.
Renfro confirms the surface-specific removal conversation and related striping needs.
The approved scope and property availability are confirmed before scheduling.
Marking extent, surface, condition, access, and follow-up striping affect the project discussion.
Mark the lines or symbols in question and provide the proposed new layout when possible.
Surface conditions, access, related striping, and current availability are reviewed before a date is confirmed.

Priority communities include Medford, Ashland, Grants Pass, Eagle Point, and Central Point. County coverage includes Klamath, Josephine, Jackson, Deschutes, and Douglas.
Service availability and scheduling are confirmed from the property location and requested scope.
Discuss it when existing markings conflict with a planned layout or no longer match the requested property use.
No universal appearance promise is made. Renfro confirms the surface, markings, method, and expected result for the individual project.
Striping is a separate approved service and can be planned with line removal when both belong in the same layout change.
Send overall and close photos, the property location, markings to remove, paved-surface details, the proposed new layout, access, and timing.